Payload 05 Information


Payload Flight Number:

2016 - 05
Institution:

Illinois Institute of Technology
Payload Title:

Scarlet Hawk IV

Student Leader:
  • James Henry
  • Mechanical, Materials and Aerospace
  • Illinois Institute of Technology
  • 2711 S. Princeton Ave.
  • 2nd Floor
  • Chicago,Illinois 60616
  • Email:jhenry2@hawk.iit.edu
  • Cell:(224) 374-6621
Faculty Advisor:
  • Dr. Murat Vural
  • Mechanical, Materials and Aerospace
  • Illinois Institute of Technology
  • 10 West 32nd
  • 253 D Engineering 1 Building
  • Chicago, Illinois 60616
  • Email:vral@iit.edu
  • Office:(312)567-3181
Payload class:
SMALL
Payload ID Number:
05
Mass:
2.7kg
Current:
59mA
Serial Commands:
YES
Discrete Commands:
NO
Payload Specification & Integration Plan
Due:
Delivered:
Payload Integration Certification
Scheduled:
Actual:
Flight Operation Plan
Due:
Delivered:
Final Flight / Science Report
Due:
Delivered:
Abstract:
Every year, the HASP program offers an opportunity for students to design, build and test a payload for stratospheric balloon flight. After a successful mission at end-of-summer 2015, IIT’s AIAA chapter is submitting a new application for the 2016 mission. Our proposal includes a main engineering experiment: a communication system between our payload and a ground-station. Learning from last year’s mission, we also designed a new version of the same structure. Adding some elements into the structure, we came up with a more robust and reliable frame. Furthermore, we chose to implement a compartment to both secure locate all electronics boards but also allow an easy access to any of their components (in case a replacement is needed). We hope to have found a structure to be used in our future missions. With the implementation of this new structural design and an autonomous communication, we hope to get closer to a CubeSat mission—our long-term goal.
Payload Integration Plan:
IIT_PSIP_2016.pdf