First of Required Payload Documents due June 1

Post Reply
GregGuzik
HASP Manager
Posts: 76
Joined: Mon Mar 16, 2009 7:28 pm

First of Required Payload Documents due June 1

Post by GregGuzik » Tue May 12, 2009 4:29 pm

In being accepted for a HASP flight you are required to submit a particular set of documents that provide us with detailed descriptions of your payload, plans and, eventually, results. The first of these documents, the Payload Specification and Integration Plan, will be due on June 1. A template for these document can be found in the Participant Info page of the HASP Website. The URL for this page is http://laspace.lsu.edu/hasp/Participantinfo.html This document provides technical details on the final flight configuration of the payload including measured weights, measured current draw (@30 VDC), downlink data format and rate, uplink commands, analog output usage, discrete command usage, and dimensioned mechanical drawings. In addition, your plans for integration with with HASP should be detailed including, at least, all test procedures and test procedure validation results, requested test equipment, schedule and personnel participating in integration.

Post Reply

Who is online

Users browsing this forum: No registered users and 1 guest